Showing posts with label allerdice. Show all posts
Showing posts with label allerdice. Show all posts

Wednesday, December 16, 2009

last minute kitchen prep

As I had mentioned in previous posts we've been working on the kitchen in preparation for the cabinet installation. In the last few days three projects have really taken over.

The Ceiling

Once we decided to go with the rustic paneled ceiling look (something I first saw and posted about here) we quickly got to work. Last week I took a trip to Allerdice and looked at a few boards that we thought might work. We were limited on the depth of the boards since the cabinets have already been ordered and delivered.

We ended up going with an 8" tongue and groove pine plank. I posted about it getting acclimated here.

The installation went pretty quickly, one board at a time. While a few were slightly warped and gave us a little bit of a challenge in the end we decided any uneven gaps just added to the "rustic" feel.

The installation took place one step at a time..
1. Ben cut each to the width of the room- we measured each one beforehand to try to prevent any major mistakes.
2. We then applied sub floor adhesive to the back of the board- an extra step and probably not a necessary one, but it made us feel a little better about them staying in place.
3. On ladders we each took an end of the board and used mallets to fit the boards together.
4. With the board up Ben used a nail gun (pictured below) to nail the boards into place.. After the first couple of boards I decided the nail gun wasn't for me.

I'm pretty sure this is Ben trying to hammer in one of the my nails...
We were able to get a little variation in the color of the boards, but they're still a little too "golden" for me, so I'm planning on lightly staining them with a custom stain we've already purchased.

The Radiator
With the cabinets still in the garage we felt like this was our opportunity to finally clean up the radiator and spray it before everything was put in it's place.

Before I got sanding, I protected the floors and walls and the functional parts of the radiator that couldn't be painted.
To prep for the painting I first used a compressor on the radiator to remove all the loose dust and dirt. Then I sanded to get rid of the old chipped paint and any extra dirt. After the sanding process was over I wiped the unit down with bleach and once it was dry I primed it with a spray primer.
With the primer dry I started spraying it with the semi gloss white paint. I went over it and over it- going through three cans, but in the end I was pleased with the result.
But then again, anything beats what we started with.

The Windows

I'm in the process of working on sanding the windows before the cabinets go in- anything to prevent more mess once we can finally put things away!
I still have two and a half windows to go- its been a little bit of a challenge because of the layers and layers of old paint. Not to mention I take frequent breaks- even with a dust mask, working with old lead paint isn't fun!

I know I won't get to painting them before the cabinets go in, but we're going to replace the window and door casings after the installation so I'll plan on doing all of the painting at once. Definitely looking forward to getting rid of the minty green!

Monday, December 14, 2009

rebuilding the kitchen

This past weekend has been quite busy on the corner of Bensonhurst and Division. We've been nonstop since the cabinets were delivered on Friday and we're still not done, but here's a quick look into what the last few days have been for us (and why it really hurt to get out of bed this morning).

Thursday
So might as well start where I left off. Last week Ben and I literally demolished the kitchen to make way for new electrical and plumbing. It was easier for them to have full access and as you can tell by the picture below- we now have lots of new wiring for everything..
And the plumber disconnected the sink allowing us to remove the final base cabinet..

Friday
With the electrical in and no major problems along the way I was pretty sure the cabinets wouldn't arrive when they promised they would.. but I was wrong. Instead they arrived early and now our garage is packed with them!
Once they arrived I called Home Depot to set up the installation. I was told that the installer would call me, but I haven't heard from them yet. I'm dying to get them in.. so installers, if you're reading this call me!!! I'm crossing my fingers I'll be able to get them in this week because I've put off the appliance delivery yet again (about the 5th time) and hope that Friday's delivery won't have to be postponed.

And with the cabinets delivered we knew we had a busy weekend ahead of us. But before we started doing anything, we needed to figure out what to do about the ceiling. After a little research we decided to go with the wood paneling I posted about here, so I headed to Allerdice to pick out the wood before it got dark. Once I opted to use the 8" pine and got Ben's approval, we headed back to Allerdice and picked it up. Ben wanted to give it a couple days to acclimate before we started actually installing it..
hence the new obstacle on our living room floor. I apologize for the mess, but we might as well be honest- I consider our living quarters fairly "rough" these days. Not to mention our housekeeper (me) has been a little preoccupied and hasn't really had the time to maintain the household.. but at least I'm keeping everyone fed!

Saturday
We spent Saturday morning cleaning up the rest of the walls, including behind the sink base cabinet. When we first started removing the sheetrock we didn't do the cleanest of jobs- we were trying to get it done quickly, so we had to go back over some of the areas and I had to remove the nails along the studs.
Ben spent the afternoon insulating three out of four walls- we opted not to insulate the wall between the living room and kitchen.
And while he finished up that I got the fun job of removing all of the staples used to hold up the ceiling tiles.

Sunday

We were hoping to get to the sheetrock by Saturday afternoon, but as to be expected we were a little behind schedule. That and the electrician cut all of the electricity on that side of the house until the cabinets are in so we're limited to daylight hours meaning our workday ends at 4:30. So Sunday was our day of catch up. We decided we were going to do all of the sheetrock and start on the ceiling before we called it a day.

In the morning we picked up all of the sheetrock and then we got moving.
Ben cut the sheetrock panels with a knife and we (yes Ben and me) cut out the outlets with a dremel.
Once we were done with the sheetrock it was getting late, but we still wanted to get moving on the ceiling. Because we're not quite done yet I'll wait to post about the ceiling later this week. Also happening this week- sanding and painting the kitchen radiator, sanding the windows and prepping the rest of the kitchen for the installation..

Monday, October 12, 2009

bad news ben

Because Ben and I are currently living separately- he's in Saratoga starting our lives up there while I'm in New York City trying to clean up and pack up the lives we're leaving behind- our communication has turned to regular phone calls. Often times he starts the call with an update on his job, sometimes he talks about the weather and how unbelievably cold it got very quickly, then I start complaining about packing and suddenly he hits me with bombshell. Something has gone wrong on the house.. again! But there are times when he doesn't sugar coat the situation- he skips the weather and lays it on me.

The process goes something like this..
1. Ben updates me on the "crisis"
2. I make sure he's not kidding and then I have a minor panic attack because whatever the solution it's going to cost MORE money that we don't have
3. Ben says he has a solution
4. I veto the solution and give him a **better solution
5. We argue
6. I'm right

** I must point out that I added the asterisk because if he were writing this post his opinion would differ drastically. The reality is (and I'm not going to sugarcoat it for the readers) Ben and I are two very strong personalities- though, I think I give in a lot (whether my family believes it or not)! But when it comes down to it, Ben makes decisions to get things done where as I think them through, thoroughly. And while one is not necessarily better than the other, in our situation (due to our tight budget and wreck of a house), thinking these things through is so necessary.. hence me being right all the time.

A little peak inside our "renovating relationship" It's important to mention that our communication during this process is VERY different than how we normally behave- but that's to be expected due to the added stress.
On Monday night I announced to Ben that from now on every time one of us is right about something we get a notch on our belts. Ben made it a point to say the notches are not retroactive (which is unfortunate for me and very lucky for him). But even with that little clause in the agreement, I currently have four notches.. Ben has zero.

Back to the bad news..

Remember the original wallpaper issues I posted about here? Well they just don't seem to end.
On one particular afternoon a couple weeks ago Ben started plastering and sanding the walls in one of the bedrooms and I got a call. The plaster was pulling what appeared to be a wallpaper liner off the wall, revealing another layer of wallpaper underneath.
We had seen a hint of the paper pictured above when we were stripping the walls, but neither of us ever thought that this was something that had to be removed as well.

But not to worry, Ben decided there was no getting around the issue, so he acted quickly and bought a steamer at Home Depot. He called to let me know he was going to strip the liner and the layer of wallpaper and then all of our problems would be solved (in that room, of course). After a couple hours of him trying to steam and strip, he said the moisture from the steamer was collecting on the ceiling and drops of dirt were falling from overhead. Everything was wet and the wallpaper and the liner just weren't coming off as quickly as they were supposed to. When he got lucky he'd get a hold of a strip and pull, though often times he'd not only pull the liner and the wallpaper, but he'd get a chunk of plaster too.
Leaving us with far from perfect walls (remember we are no professional painters so our patching skills can't be trusted) and a steamer. Just perfect.

Once Ben started seeing the plaster pieces come loose my phone rang again. This time he said his solution wasn't working. So what's Plan B you may ask? Plan B in our renovation diaries seems to always be the same.. laminating the walls in 1/4" sheetrock... Remember when Ben called me lazy for throwing in the towel during my living room wallpaper removal adventures? You can read about that lovely argument here. And by the way, he still denys he ever said that.

1/4" sheetrock seems like a good solution- Ben swears he knows how to install it, it's going to cost more but once again the fact that our house is small is looking more and more beneficial everyday. While we're adding two new rooms to the "re-sheetrocking" list, (both the bedroom and office have the awful liner) the extra expense is almost worth it to know in the end we'll have clean walls and will hopefully have spared the headache or two that could have been caused by the patching and sanding.

Here's the catch..
While all of the professionals say when a situation like this arises to install 1/4" sheetrock as a lining. It's easy to use, not heavy and can be installed right over the imperfect walls. It masks all minor wall damage, just keep in mind it does not hide slopes in the walls unless you level them off beforehand. We have this slope on one of the bedroom walls that Ben would like to correct-
though it doesn't bother me for two reasons.. 1) it's an old house, therefore to be expected and 2) I pick my battles. I'm desperate for clean, painted walls.. clean, painted, sloped walls still sounds pretty good to me.

While the 1/4" sheetrock sounds like a wonderful solution here are some of the issues that we had to take into consideration:

- Delivery. Sheetrock comes in large sheets and cannot just be put into any vehicle. While delivery is always an option we have been trying to cut costs by forgoing any delivery fees and picking up items ourselves.

- Time. We're moving in two weeks, Ben's working full time and I'm not available to help which means there's no chance any of the installation will get done before our furniture arrives.

- Availability. 1/4" sheetrock is that it's considered a "specialty" item. Home Depot doesn't carry it, nor does Lowes. And because it's specialty means it's more expensive.

But with every issue we have come across in the last two months, we have come up with solutions for these as well..

- Delivery. I've never been so happy to have a very big, very real pick up truck (even if I still have a terrible time getting into it.. I pulled a muscle on my first try).

-Time. There was no avoiding the issue of time. The truth is, everything is taking longer than we first expected and nothing will be done before the move in date. Again, in order to practice patience I'm trying to let the time thing go. Ben did say he'd try to get the living room done first so we could live out of there while the other rooms are getting done- not to mention our bedroom is now serving as a closet..
and because I want to organize before we start just putting things away, I asked him to work on that room after I get in there and figure out where we should put everything (clothing storage is a little bit of an issue).

- Availability. We looked into ordering 1/4" at our local hardware store Allerdice, but it was about $2.00 more a sheet than the in stock options. Because we're trying to save our pennies Ben and I went from room to room with a piece that is 3/8" thick and stocked at all major stores (aka Home Depot).
As you can see above since our moldings are so thick, the 3/8" worked, but in considering all of the details of the room we came into another problem- the ugly crown molding that we desperately want to replace is only 1/4" thick.
You may not think that's an issue because we do want to replace it- you may even think we can use the money we saved on the sheetrock to buy new crown molding, but in reality molding is expensive, hard to install and very time consuming. New crown molding goes on the list with new ceilings and overhead lighting- all things we won't be able to begin discussing for a couple of years. So with that said I made an executive decision. In order to spare ourselves from living in a home (for an unspecified amount of time) with unfinished crown, I decided we should spring for the more expensive sheetrock- not to mention the 1/4" will be a little easier for Ben to install himself.

And we took a trip to the lumber yard..

Having a husband who works for a contractor has its benefits (and I'm not just talking about the truck). Yes the truck helped- how else would we have traveled to the lumber yard and actually fit in??.. but having a sales rep he deals with regularly and receiving pricing based on a contractors account is also very helpful. I must point out that a lot of what we have been able to do was made possible through our various vendor relations- we can't overlook that. So on Thursday night we hopped into the truck (again I had some difficulty) and drove down to Curtis Lumber in Ballston Spa. And that is exactly where I whipped out my camera to document our picking up close to 40 sheets of 1/4" sheetrock.

I must also point out that these pictures were not easy to get. Ben was complaining as I clicked away.. he even said he'd never be able to show his face there again. After that comment I felt compelled to inform the guy that helped us that this was for a blog.. not that he cared.
looking back at the sheetrock through the truck

Just fyi for all of you who were concerned.. Ben was able to show his face there again. In fact, the following morning he made another trip there for something work related.. and the same lucky guy helped him.