Thursday
So might as well start where I left off. Last week Ben and I literally demolished the kitchen to make way for new electrical and plumbing. It was easier for them to have full access and as you can tell by the picture below- we now have lots of new wiring for everything..


Friday
With the electrical in and no major problems along the way I was pretty sure the cabinets wouldn't arrive when they promised they would.. but I was wrong. Instead they arrived early and now our garage is packed with them!

And with the cabinets delivered we knew we had a busy weekend ahead of us. But before we started doing anything, we needed to figure out what to do about the ceiling. After a little research we decided to go with the wood paneling I posted about here, so I headed to Allerdice to pick out the wood before it got dark. Once I opted to use the 8" pine and got Ben's approval, we headed back to Allerdice and picked it up. Ben wanted to give it a couple days to acclimate before we started actually installing it..
Saturday
We spent Saturday morning cleaning up the rest of the walls, including behind the sink base cabinet. When we first started removing the sheetrock we didn't do the cleanest of jobs- we were trying to get it done quickly, so we had to go back over some of the areas and I had to remove the nails along the studs.

Sunday
We were hoping to get to the sheetrock by Saturday afternoon, but as to be expected we were a little behind schedule. That and the electrician cut all of the electricity on that side of the house until the cabinets are in so we're limited to daylight hours meaning our workday ends at 4:30. So Sunday was our day of catch up. We decided we were going to do all of the sheetrock and start on the ceiling before we called it a day.
In the morning we picked up all of the sheetrock and then we got moving.


Great Kitchen Cabinets And Kitchen Design Give a new Look to Your Kitchen. This is an great site for those who want to Give a new Charming Look To their Old or new Kitchen.
ReplyDelete